ROAD CLOSURE HAS BEEN CANCEL FOR NOW – Issue with Utility Relocation.
Wenzel Road Culvert ReplacementStarting on Monday, May 16, 2022, Wenzel Road will be closed to thru traffic from Roach Road to Seiler Road.  The Village will be replacing the culvert that runs under Wenzel Road near the Fosterburg Water Tank.  The Village expects the road to be closed for approximately two (2) weeks.  Homes on the east side of this culvert (from Seiler Road to 5316 Wenzel) will need to use Seiler Road to enter and exit to their homes.  All homes on the west side of the culvert (Roach Road 5310 Roach Road) will need to use Roach Road to enter and exit their homes.  There will be no access traffic allow on Wenzel Road at the construction site.